Sheet E-202 / Site photos

Recent work.

Six jobs pinned to the board, each with the scope, how long it took and the price band it landed in. These are sample projects for this demo site, written to show how we record a job.

Sample projects. Photos are stock, details are illustrative.

Six jobs on the board.

The callout under each photo is how we file every job: scope, duration and price band.

A charging cable plugged into the port of a dark grey car
Job 1: Garage charger, Los Gatos.

48 amp charger, 30 foot surface run

  • Scope60A circuit, hardwired wall unit, permit
  • DurationOne day, inspected day 4
  • Price band$1,275 to $1,900
A technician in a cap pressing buttons on a closed grey electrical control cabinet with indicator lights
Job 2: Panel swap, Monte Sereno.

100A to 200A service upgrade

  • ScopeNew panel, meter, mast, utility coordination
  • DurationOne day, power off six hours
  • Price band$4,800 to $6,500
A bright white kitchen with recessed lights and three glass pendants over the island
Job 3: Kitchen lighting, Campbell.

Twelve recessed, three pendants

  • ScopeThree dimmed layers, plaster patching
  • DurationTwo days
  • Price band$3,500 to $6,000
Hands fastening a wooden wall plate with an insulated screwdriver
Job 4: 1938 bungalow, Saratoga.

Knob and tube rewire

  • ScopeWhole house, 22 circuits, fished wire
  • DurationEight days, lived in
  • Price band$18,000 to $24,000
A two storey house at dusk with a closed garage door, a lit window and a white box mounted by the entry
Job 5: Hillside home, San Jose.

Home battery and critical loads

  • ScopeBattery, gateway, critical loads subpanel
  • DurationTwo days, utility sign off 3 weeks
  • Price band$13,000 to $17,000
Hand tools and power tools hung in rows on a pegboard wall
Job 6: Workshop, Cupertino.

Garage workshop subpanel

  • Scope60A subpanel, 240V outlet, LED shop lights
  • DurationOne and a half days
  • Price band$2,600 to $3,800

Your job goes on the board next.

Every job gets the same record: a drawing, a fixed price, a permit and a final inspection. When we finish, you get the file. Want to see how the steps run? Read how a job runs, try the EV charger estimate, or request a site visit.