EV chargers, panel upgrades and lighting for homes in Los Gatos and the hills around it. We draw every job before we cut a single hole, so you see the plan and the price first.
Office Mon to Fri, 7am to 5pm. Emergency calls answered 24/7.
Section A-A / Scale NTSStop 1 of 4: panel
1Stop 1 of 4
200 Amp
It starts at the panel.
Every circuit in your house leaves from one box in the garage or on the side wall. Before we quote anything, we open it, count spaces, read the main breaker and check for the brands and wiring that inspectors flag.
Main breaker size and spare spaces
Grounding, bonding and the meter base
Double taps and scorched lugs
2Stop 2 of 4
20 A circuits
Kitchen and lighting.
Kitchens need their own 20 amp counter circuits, GFCI protection near water, and lights you can actually cook under. We lay out recessed cans, pendants and under cabinet strips on a ceiling plan, then put each layer on its own dimmer.
A Level 2 charger is one dedicated circuit, but the size of that circuit depends on what your panel can spare. We measure the run, check the load, and tell you if a 40 or 48 amp charger fits without an upgrade.
When the power drops, a battery or generator keeps the circuits you choose running: fridge, lights, Wi-Fi, the well pump if you have one. We size it to what you actually use, not to the biggest box on the shelf.